20.12.2011 SLOVENSKÉ ELEKTRÁRNE, A.S., ENO PLANT - 300M, 150M HIGH CHIMNEY AND ASH SILOS RECONSTRUCTION

After three months of intensive engagement of our four working teams we have completed a repair of emergency reinforced concrete defects on three high-rise buildings in SE, a.s., ENO plant.

30.09.2011 VOLSKWAGEN, A.S., BRATISLAVA – PAINTWORK ON THE +150M AND +83M HIGH CHIMNEY

In October, we supplied a complete coating of a 150m high power engineering chimney and 83m high paint shop chimney in Volkswagen Bratislava.

30.09.2011 BAT, A.S., BRATISLAVA – CHIMNEY REPAIR IN K6 TEPLÁRNE VÝCHOD

In the autumn 2011, we successfully completed an extensive repair of damaged inner load-bearing parts of the K6 +70m high chimney in Bratislavská teplárenská, a.s. – plant VÝCHOD by guniting chemically and thermally resistant materials from MC Bauchemie.

07.09.2011 SLOVENSKÉ ELEKTRÁRNE, A.S., ENO PLANT- HTA FLUE-GAS DUCTING REPAIR

A repair of desulphurized waste gas duct system of one of the largest flue-gas ducting in Slovakia was launched during a shutdown in desulphurization unit.

05.09.2011 KOSIT A.S., KOŠICE – REPAIR OF REINFORCED CONCRETE Z-SHAPED BRICK CHIMNEY IN INCINERATION HOUSE

Both chimney platforms in the incineration house KOSIT, a.s., Košice were rehabilitated and the lower one also supported by steel brackets at the turn of August and September 2011.

30.08.2011 KOVOHUTY, A.S., KROMPACHY – REPAIR OF A REINFORCED CONCRETE MONOLITHIC CHIMNEY

After insulating the upper part of the chimney liner +201/2.75 m from the interspace in 2011, we went back to KOVOHUTY, a.s. upon the customer´s request already in spring in order to carry out repair works on an outer reinforced concrete shaft in the summer season.

27.07.2011 DUSLO, A.S., ŠAĽA –RECONSTRUCTION WORKS STARTED ON THE +240M HIGH HEATING PLANT CHIMNEY

A complete reconstruction of a +240m high chimney in Duslo, a.s., Šaľa heating plant started on 27th July 2011. It included a local repair of stainless ventilation liner sealants as well as the rehabilitation of anticorrosive coatings on anti-vibration spacers.

22.10.2010 MONDI SCP, A.S., RUŽOMBEROK – REMEDYING EMERGENCY DEFECTS ON THE +120 M HIGH CHIMNEY

The necessary repairs of all parts of the chimney cannot be completed within one year. The plan of repairs is divided into stages according to specific steps.

12.08.2010 AOS LIPTOVSKÝ MIKULÁŠ – REPAIR OF 55 M HIGH 4-VENT CHIMNEY

A repair of 4-vent monolithic reinforced concrete chimney took place in August. The original ceramic liner casing was replaced by stainless steel one.

15.06.2010 ŽILINSKÁ TEPLÁRENSKÁ, A.S. - 192M HIGH CHIMNEY REPAIR – 2ND STAGE.

These days, we are starting a 2nd stage of a 192m high chimney modernization for Žilinská teplárenská, a.s.