28.04.2017 CRH (Slovakia), a.s., Rohožník – Complete Reconstruction of Reinforced-Concrete +130m PC2 Chimney, Stage III

On 28 April 2017, we successfully completed the third stage of a complete reconstruction of the reinforced-concrete PC2 +130.0m chimney of CRH Rohožník, a.s..

23.02.2017 MONDI SCP, a.s., Ružomberok – Remediation of a K3 SO241 +120m Chimney Built of Z-Shaped Blocks

At the beginning of February 2017, a comprehensive remediation of the SO 241 object – K3 120.0m built of Z-shaped blocks was completed.

31.01.2017 CRH (Slovakia), a.s., Rohožník – Complete Reconstruction of Reinforced-Concrete +130m PC2 Chimney, Stage I and II

On 31 January 2017, we completed – in compliance with the schedule – the first and second stage of a complete reconstruction of the reinforced-concrete PC2 +130.0m chimney of CRH Rohožník, a.s..

20.12.2016 KNAUF INSULATION S.R.O., NOVÁ BAŇA – 1ST STAGE OF +130 M REINFORCED CONCRETE CHIMNEY RECONSTRUCTION

In December 2016 we have successfully completed a first stage of a 130 m high reinforced concrete monolithic chimney reconstruction in KNAUF Insulation, s.r.o., Nová Baňa. The project was delivered in advance compared to original plan.

06.10.2016 BUKOCEL, A.S. – REPAIR OF A CRITICALLY DAMAGED INTERNAL ZONE ON A MONOLITHIC CHIMNEY FROM +90.0 M TO +117.5 M

We completed repair works on a critically damaged internal zone of a monolithic chimney reaching from +90.0 m to +117.5 m in BUKOCEL, a.s., Hencovce on 3rd October 2016.

02.09.2016 STEFE BANSKÁ BYSTRICA, A.S. – RECONSTRUCTION OF A STEEL CHIMNEY +45.0/1.8 M WITH A STEEL SUPPORTING STRUCTURE.

The reconstruction of a steel chimney +45.0/1.8 m with a steel supporting structure in STEFE Banská Bystrica, a.s., was completed on 31st August 2016.

04.11.2015 OLO, A.S., INCINERATION HOUSE, BRATISLAVA - STATIC REINFORCEMENT OF THE CHIMNEY SHAFT

“Repair works of a +120/2.39 m chimney – 3rd part – static reinforcement of the chimney shaft in OLO, a.s., Incineration House in the planned scope” was completed on 4th  November 2015:

22.10.2015 UNIVOLT-SLOVAKIA, S.R.O., PEZINOK – DEMOLITION OF A T-3 TYPE +31M HIGH INDUSTRIAL CHIMNEY

A project entitled “Demolition of a T-3 type +31m high industrial chimney” for UNIVOLT - Slovakia, a.s, was handed over on 22nd October 2015 in Pezinok.

22.10.2015 HEINEKEN SLOVENSKO, A.S., HURBANOVO - REHABILITATION OF A +41M HIGH CHIMNEY

A project entitled "industrial chimney rehabilitation" for Heineken Slovensko, a.s. in Hurbanovo was delivered on 22nd October 2015.

30.09.2015 KOSIT, A.S., KOŠICE – REHABILITATION AND LINER INSTALLATION ON THE INCINERATION HOUSE CHIMNEY

Complete project execution regarding the chimney liner installation: