CRH (SLOVENSKO), A.S., ROHOŽNÍK – COMPLETE RECONSTRUCTION OF A N. 1 CEMENT SILO IN ROHOŽNÍK PLANT
On 21st of October 2016, a complete reconstruction of N. 1 cement silo in CRH (Slovakia), a.s., Rohožník plant was completed successfully.Following works were included in the reconstruction process:
- Removing the damaged and degraded concrete parts on the outer surface of the silo;
- High pressure water jet cleaning of the outer silo surfaces;
- Reconstruction of the damaged and exposed reinforcement;
- Closing the cracks;
- Concrete remediation the outer surfaces of the silo;
- Daywork joints grouting on the silo;
- Smoothing the outer surface on the silo;
- Full-area application of the corrosion inhibitor;